ROAD & BRIDGE
Some of the work done by Frio County Road & Bridge in Precinct 4 for the week ending Friday June 11th:
Hauled millings to CR3715 (Schorp) and from various TxDOT stockpiles/Vulcan Materials to county yards in preparation for continuing patching/grading
Patched CR4670 (Hugo), CR4614 (Klopek), CR4675 (Good)
Graded CR4670 (Hugo), CR4538 (Old Divot Hwy), CR4629 (Herwig), CR3871 (Hindes), CR4757 (Leona River)
Shredding CR4670 (Hugo)
Septic Inspections
Vector Control/Mosquito Spraying
Last week, I met with Zavala Pct. 1 Commissioner Joe Cruz. We share Leona River Road, and talked about ways we can work together to maintain the road for our constituents.
Millings in position:
Grading:
Road and Bridge sprayed for mosquitos on county roads close to Dilley, including Hilltop and other areas:
Good Road near Hugo was prone to flooding, leading to damage. Material was added to the low point:
Removing excess dirt, silt, and growth from the edges of the road after the rains to maintain the edge-to-edge clearance:
Patching:
–written by Jose Asuncion, County Commissioner, Pct. 4
–photos by Jose Asuncion, Anthony Gonzales, and Joe Louis Hernandez Jr.